Thursday, June 23, 2011

Countertops and More

Our countertops will be installed today. Hopefully everything goes well, and there's a follow-up post this evening with pictures of a nearly complete kitchen. Beau has the applicances scheduled for delivery tomorrow, and the plumber lined up to take care of some small things. After that, all that's left is back splash.

I can't wait to have my kitchen back. A few weeks ago, I was instructed by my doctor to cut-out carbs to help manage my blood sugar, which I've done before, and it's totally managable... with a kitchen. Eating grilled chicken with vegetables from various take-out places around town has gotten old.

A lot of progress has also been made in the soon-to-be nursery. Mom came over last week and helped us move furniture out of it. Beau pulled up the carpet then painted and put down laminate wood floor. Thanks to Miranda for color selection, and Nathan, Michael, and Chris will the flooring help. It was quite nice to leave in the morning for a day at the spa with Miranda and friends and come home to a room with new flooring in it! Beau put trim up in the room this week, and we've been working on filling and caulking it. For obvious reasons, the kitchen has taken priority.

Hopefully pictures will follow soon!!

Wednesday, June 1, 2011

Getting closer...

Although the progress isn't visible, it is real.  The slabs for our counter tops have arrived in Baton Rouge!  Jenny and I went to check them out on Friday and choose how we want the counters to be cut from them.  The fabricator was happy, maybe even impressed, with the quality of the slabs.  We are now waiting for the fabricator to cut and finish the stone and then install!  I'm hoping that we can get them installed next week, but I'm probably being overly optimistic. 

Now it's time for a pair of rants and a rave.  

I hate plumbers.  No, really.  I am thoroughly convinced that plumbing is the single biggest rip-off in home renovation.  I got an estimate to run the gas line for our stove.  There are two different lines that can be tapped into that are easily accessible in our attic and don't require any long or complicated runs.  Yes, the line has to be plumbed down the wall.  It is not that big of a deal.  Guess what the estimate was.  Most people have guessed in the $500 range given the tone of my explanation.  $1000!  That's right, a grand for maybe $200 worth of material and probably 2 hours work.  He even readily admitted that this job was pretty straightforward. 

We ordered our sink from Amazon.  Jenny had a couple of gift cards that she had been awarded through work and their prices were reasonable.  We found an enameled cast iron undermount sink that we liked.  It shipped through a freight carrier because it was too big to ship via fed-ex, ups, etc.  I tracked down the carrier to schedule a delivery (long story - amazon was very helpful).  When the sink arrived, I opened it up to inspect it before signing off on the delivery.  Good thing I did, the sink was broken in two places.  That's special guys, you managed to break a cast iron sink, twice.  I sent it back and called Amazon.  Amazon said that since I had refused delivery, they could get another on its way immediately.  I asked if they could expedite the shipment, but because of the delivery method it wasn't an option.  Because they couldn't expedite it, they gave me $75 back (thanks!) and sent me another sink.  Lesson learned - Amazon rocks!

We ordered our hood vent from Homeclick.com.  It said "in stock" and probably still does on their website.  I called customer service because the ship on date came and went.  The guy said he would have to contact a vendor and get back to me.  (Isn't it in stock?)  He didn't get back in touch with me.  The following week I call again.  "The computer says it's in our warehouse.  That means it should ship out tomorrow if it didn't go today. Let me put you on hold while I contact our warehouse."  *hold*  "Uh, they aren't answering their phone.  It probably shipped out today or will tomorrow.  Sorry you didn't get contacted after your last call, the computer must have screwed up."  Doubtful.  Amazon sent me 2 sinks via freight carriers in the time it sent Homeclick to fed-ex me one in-stock item.  Customer Service - unsatisfactory.  I DO NOT RECOMMEND HOMECLICK.

Being without a kitchen sink and counter tops has been a bit annoying, but hopefully the kitchen will be usable soon!  After counter tops, appliances go in and then backsplash and we are done!  

That's when work begins on the nursery... :)

Thursday, May 19, 2011

I haven't forgotten about this!



The Kitchen remodel is still putting along.  I didn't post for a long time because most of the work that was done was little stuff (like finishing the sheet rock behind the fridge, removing cabinet doors, etc.) that wasn't really interesting.  Now, we are finally in the homestretch.

The kitchen was painted a couple of weeks ago and it didn't go swimmingly.  I think perhaps my expectations were too high, you be the judge.

When it came to painting the cabinets, I decided to call in an expert for a few reasons.  First, I know how long it takes me to paint and I knew that a professional could get the job done more quickly.  Second, I wanted the super smooth finish of an airless sprayer.  These tools are awesome pieces of equipment that require experience (that I don't have) to operate.  Third, by the time I rented all of the tools and masked everything off, it would be worth my time and money just to hire someone.

Expectations:  I got a couple of estimates from guys with good reputations. (All of the painting done on my house had been performed by me up to this point so I had to rely on other people's experiences for guidance.)  I ended up hiring the less expensive guy because he was more confident that he could get to me in less than 6 weeks.  (Apparently the painting business is good right now.)  I expected the results to be better than something I could have done myself.  I expected a near flawless, glossy, smooth finish.  I expected that they would do all of the necessary prep work (which I had pretty much spelled out when the estimates were written).  I expected the job to take about 3 days (less than 8-hour days) of work.

In order to avoid going into every detail, they didn't prep nearly as thoroughly as I do, used equipment that was in need of repair and consequently had to basically start all over.  They had to sand through the paint, primer and previous finish to get down to bare wood in many spots because they hadn't prepared the surface properly.  The work took over a week to get finished because of all of the extra work that had to be done.  The cabinets didn't come out as well as I had hoped.  I am now having to come behind and touch up (something I was really hoping to avoid.)

Things the painter did right: he was good about staying in touch with me and communicating his plan.  He never ducked my phone calls and was professional about everything.  In the end he knocked $100 off of his original estimate because he was disappointed in how the job went.  I'm pretty sure he ended up losing money on the job as a result.

Is this a case of if you want the job done right, do it yourself?  Should I have used a different painter?  Should my expectations have been less lofty?  The short of it is that I have been mulling this over for a while and I still don't know.  Everybody has a bad day, I know that.  This guy didn't react badly when things didn't go his way,  which is something that many contractors do.  He lowered the price in the end because he knew that he and I were both disappointed in the job.

Oh yeah, I forgot to mention that he also painted the sheet rock I had just finished, the trim I had just installed, the pocket door to the laundry room and the sheetrock on the bar/peninsula; all things that were not included in the estimate.  Also, don't get me wrong, the pictures will look good.  The flaws are relatively small but numerous and noticeable close up.

By the way, I'm better at finishing sheet rock that I thought.  It did take me considerably longer than it would a professional, though.

Don't forget to check out the pictures on Picasa.

Friday, March 18, 2011

Tile!

Well, after one small headache, the tile is being finished up.  We ran short on tile yesterday which prevented them from being able to lay all of the tile in one day which is pretty impressive.  Since the tile was not something the flooring supply had in stock, I was afraid that we would have to wait until next week to get the two boxes (12 tiles) we needed to finish.  Thankfully, the salesman at Prosource was able to track down a distributor in town who had some on hand.  After being told that they didn't have any from the same lot as ours, it turned out that they did and we were back in business.

The tile masons are finishing up the grout right now and should (I think) be done by lunchtime.  Yay!  I can't express how happy I am to be done with the broken, peeling vinyl floor.  It was disgusting, ugly and a tripping hazard.  Hopefully I can get some painters out here next week to give me a quote on painting the cabinets and get the cabinet guy back out here to measure for doors.  Let's keep some momentum going!

Incidentally, I also had a small roofing repair which I was able to get done on Tuesday.  Some of the shingles on our ridge vent were damaged in a recent storm.  I probably wouldn't have noticed it if Jenny hadn't pointed it out.  Twenty bucks in materials and about 45 minutes or so of work to get it fixed.  Not too shabby.

Pictures of the new floor to come soon.

Monday, March 7, 2011

Progress is being made

Sorry for two posts in one day, but they are pretty unrelated and occurred days apart but didn't get blogged about because things have been a little hectic.

Sunday afternoon Nathan and I set about modifying the cabinets to suit our new kitchen plan.  We will be installing a slide-in range where the cooktop previously resided.  In order to make this happen, we needed to cut the 30" hole in the cabinets where the range will go and then remodel the remaining cabinets on either side.  

I removed the cooktop right before Nathan arrived.  First, we set about removing some of the Formica countertop.  Nathan hates Formica.  I only included this because I think this fact came up about 2 dozen times.  It was removed pretty much without incident.  

The next step was to cut the cabinets.  We brainstormed a little bit and then came up with a system/jig to promote straight cutting and clean edges for our cuts.  The cuts were made with a circular saw, which worked well except that you can't cut all the way to the floor with a circular saw.  The front edge of the blade is recessed a few inches short of the front of the tool.  

As we had anticipated this problem, I borrowed a handy tool from Mr. James to help us out.  If you are into home improvement or tools in general, one of the new tools to hit the market is these little oscillating multi-tools.  You'll see commercials where they use them for cutting, scraping, sanding, etc.  The often have a little triangle-shaped sanding pad or other attachment affixed to the front.  This is one of those tools that is a jack-of-all-trades and master of none.  I dare say that there is a better sanding tool, scraping tool, and cutting tool out there, but this little guy is mighty handy.  He allowed us to cut pretty much whatever we wanted, wherever we wanted.  We used him to cut a lot of parts that were hard to get to.

We then set about building the end pieces for the new cabinets.  We used a table saw that I had been given a while back but never really used.  The next part is really a bit embarrassing.  The saw was not cutting very well and creating a bunch of smoke.  Twenty minutes or so into using it, Jenny rolls up and says: "Um, is the blade on backwards?"  Yes, yes it was.  It is really annoying when engineers do that.  90% of the time they make the job harder than it has to be, ask 1400 questions and provide little to no help.  This time, Jenny was absolutely right and we hadn't even considered that particular source of our troubles.  TO OUR CREDIT, the blade was installed backwards when it was given to me.

After flipping the blade around, the saw worked much better and without smoking us out from the burning plywood.  Ugh.

Anyway, after an hour or so of ripping down plywood on the table saw, we had the sides and stiles cut for the cabinet.  I have to finish nailing it all together since the hardware store was closed by the time we got to that step.  All in all, it was a very productive day and Nathan was once again quite helpful.  


I uploaded a few new pictures to the Kitchen Remodel album on picasa (link on the right.)

I hate plumbing


I will explain the photo above in just a minute, but first a little bit about plumbing.  There is a saying in construction: "There are only two things to know about plumbing: sh!t rolls downhill and payday's Friday."  This is not far from the truth.  Plumbing is very simple and uncomplicated.  It is, however, a royal pain in the butt.  As I was attempting to get some work done in the kitchen (removing the dishwasher in this instance) I realized there was water dripping from the hot water connection under my sink.  Because there is not a shut-off installed, I figured I would go ahead and kill two birds with one stone.  A shut off is that little knob that you will probably find against the wall underneath every toilet, sink, washing machine, etc. in your house.  A brilliant idea, this is intended to allow you to shut off the water supply to that fixture without having to turn the water off to the whole house.  This was not part of the building code in 1962.  (Was there even a building code in 1962?)

Unfortunately, due to the simplicity of the basic nature of plumbing, every joe blow handyman thinks that he can tackle any plumbing problem.  Apparently this was the case when it comes to the hot water supply to my kitchen sink and disposal.  The reason it was leaking is because the two fittings you see on either end of that T connector above are for natural gas.  As you might guess, natural gas and water have some slightly different properties.  Genius.

Having done one previous plumbing project in my house, the whole thing was galvanized pipe which is pretty helpful.  I say this because there are no special tools or knowledge required to work with galvanized pipe.  Since I couldn't see what was in the wall, I assumed that it was all galvanized pipe.  It wasn't.  I tried in vain to disconnect that T connector in any way that I could.  Note: underneath the kitchen sink is not the most comfortable place to work.  Eventually, I just tried to turn the whole thing.  The copper elbow you see on the left was happy to let go and the whole thing came out.  This is because copper is very soft and doesn't screw together.  

After a few unhappy words, Jenny showed up and we brainstormed a bit.  The most common way to connect copper pipes is by soldering them together.  This is the third thing that you need to know to be a plumber.  It is not all that difficult to learn, but it does require a blow torch.  There are some downsides to this.  When you are working inside a wooden cabinet, most things around you do not respond well to a high temperature flame.  I decided to go to the hardware store and purchase a brass compression fitting, the other way to attach copper pipe.  

Long story short, by the next day I had the thing sorted out and the hot water turned back on.  We still don't have hot water on the kitchen sink because the hardware store was out of the cap I needed to close off the dishwasher connection and I haven't bothered to find another one.

Here is why I hate plumbing: there is nothing difficult conceptually about plumbing, but it tends to be in the most awkward spaces to work, it never goes quite as you hope, you NEVER know what is behind a wall, and most importantly plumbers cost a fortune!  I despise this because there really is nothing particularly difficult about plumbing!

Wednesday, March 2, 2011

Kitchen Remodel Under Way!!!

All right, folks, the kitchen remodel has officially begun!  Make sure to check out the photos by clicking the link on the right-hand side.

Well, Jenny and I ordered the tile last Thursday and began our grand adventure into kitchen rehab.  Over the weekend we packed up all of our kitchen items setting aside what we considered the bare essentials to get us by until the project is done.  I will be setting up a temporary kitchen in the front room in the near future.

On to the project -- There is a good bit of work for me to do before the tile can be laid.  Our cabinet guy delivered our new lower cabinet (a three-drawer piece) that will go where the refrigerator was.  We needed this to get started because the tile will be laid around it.  I spent yesterday (Tuesday) ripping out cabinetry.  As with any renovation, there are always some small (or large) unexpected hurdles.  Since I wasn't around in 1962, I kind of assumed (before we purchased the house) that cabinets were built then as they are now.  Not so!  Most (read: all that I know of) modern custom cabinets are built modularly.  That means that each unit is assembled in a shop, transported to the house and then installed and attached to one another in place.  In the 1960's many cabinets were built on site, in-place.  What this means to me is that I can't just unscrew the cabinets and carry them to the curb.  They are all attached to each other with lots of 2" nails.  All in all, it wasn't as bad as I thought it would be and I was pleased with my progress yesterday.

I still have some kitchen demo to do, but this stuff will be more tedious.  Yesterday mostly consisted of removing stuff that we were throwing away.  The next step is to perform surgery on the cabinets to remove what we don't want and preserve what we do want.  I'm still trying to figure out the best way to do this, but I have a few ideas. I will be making a trip to Lowe's today to pick up some supplies and seek some ideas.

The next step prior to tile installation is removal of the old vinyl plank flooring.  At first thought this might seem an easy task.  Hell, half of it is coming up already.  Unfortunately, I must remove the base trim in the hallway and closets in order to pull up the floor in there.  Let's also not make light of the fact that we are talking about over 500 ft² of flooring including three closets.  Yay.  Also, the glue that was used to adhere this stuff is pretty nasty.  The tile guy will take care of the glue as long as I remove the flooring.  To keep from getting this stuff all over the bottom of our shoes and into other areas of the house, I will put down some type of floor protector in the meantime.

There are about 2 dozen more steps in this process and I won't bore you with all of the details yet.  I hope to keep up the blog on a daily (read, days I work on the project, not every day) basis.



As a side note, one of the camellias is dying.  The biggest one has struggled since being transplanted and is in dire shape.  On the other hand, the other two seem to be doing very well.  I will let you know what happens.

Friday, February 25, 2011

NEW ADDITION!

NEW ADDITION

As most know, Beau and I are expecting our first child in August. We are both very excited, and in typical Jenny-fashion, I’m thinking about all the things that need to get done before the little one arrives. Of course normal baby preparation isn’t good enough, and being the over-achievers that we are, we’ve decided to over-haul the kitchen too. This post will be long, so I’ve split it into “Baby Thoughts” and “Kitchen Plans.”

BABY THOUGHTS:
Beau and I found out we were pregnant on Christmas Eve 2010. Appropriate, I guess, since 5 years prior we had decided to start our family by getting engaged. I find it funny that I didn’t even consider I could be pregnant until a girl-friend accused me of messing with her cycle. Oops… I guess her body knew before anyone else.

Frankie has dubbed the baby “Beau-rito” and our friends have been very helpful with name suggestions. We appreciate them all and they’ll go onto the list once I can convince Beau to discuss names. He says we have to wait until we know whether it’s a boy or girl, which will be the end of March.

We’re both very excited, and I’ve had a very easy first trimester. I hope it continues as nicely as it started. I’m constantly worried, because I don’t feel “pregnant” and haven’t had any of the less-desirable side effects (no morning sickness… heck yeah!). Beau explains it best by saying that I “think I’m doing this wrong.”

There have been requests to see the 1st sonogram (10 weeks) and I tried to scan it in at work, but failed. I guess eventually I’ll do the old-school "picture of a picture" to put it up. I’m currently at 15 weeks, and the baby is the size of a navel orange. There are conflicting reports on other sites that it’s the size of an apple, so decide what you will.

Here’s a “your baby is the size of (Insert Fruit here)!” ticker. Maybe this HTML will work...

 BabyFruit Ticker

That's all the baby thoughts I have for now. On to more fun, immediate things... THE KITCHEN!

KITCHEN PLANS:
Ever since we saw our house for the first time, we've had plans to redo the kitchen. Everything functioned pretty well, but it wasn't pretty (By 2000's standards). I'm glad we lived in the kitchen for 3 years before re-doing it. It helps you understand what you like and what you hate. The impetus for starting now is the flooring (and the fact that we have enough money saved). The existing flooring is vinyl/wood laminate combo that's glued down. I'm sure when it was installed it was beautiful, but over the years, things have leaked under the flooring, causing it to peel and come off. It's pretty ugly and grosses me out a little.

Yesterday, we ordered our new, porcelain 18" x 18" tile and it should be arriving sometime next week. Because we didn't want to be out of our kitchen for longer than necessary, we haven't done anything to prep for it, and will have a whirlwind weekend packing and maybe doing some cabinet modification. I'll have to say good-by to my avocado green, 1972 fridge, but the environment (and my electric bill) will thank me. We're replacing it with a Kitchen-Aid french-door stainless model.

High level plan is: All new appliances, move the fridge to where the in-wall oven currently is. Install a slide-in gas range where the cook-top is. Install new cabinets with lower pot drawers where fridge currently is. Replace cabinet doors, paint cabinets. The furdown was removed in Gustav recovery. Install a hood (OMG! I haven't had a hood since we moved in because we felt it would be easier to just throw-away the old hood than to clean it. It was disgusting.). Install some sort of tile back-splash. New solid-surface countertops (we want soapstone, but may end up with a man-made product). 18" x 18" porcelain tile floor, set in diamond pattern. Remove the mini-wall between the sink and the bar.
I think that's it. There are some side projects (a new pantry, bookshelves where the phone jack is) that may or may not happen.

Contrary to the blog title, Beau will not be doing everything. He and I both recognize what our skill sets are and aren't, and will probably be contracting out some of the work. Hopefully we'll keep the blog updated since we'll have an active project happening.